home / portal / usaspending_awards

usaspending_awards: 40

This data as json

rowid award_id fain uri award_type award_type_code recipient_name recipient_uei recipient_duns awarding_agency awarding_sub_agency funding_agency cfda_number cfda_title description award_amount total_outlays non_federal_funding start_date end_date last_modified source recipient_norm
40 ASST_NON_693JF72140016_069 693JF72140016   PROJECT GRANT (B)   VIRGIN ISLAND PORT AUTHORITY D9DGBY9P8Y78   Department of Transportation   Department of Transportation 20.823 PORT INFRASTRUCTURE DEVELOPMENT PROGRAM AWARD PURPOSE THIS PROJECT WILL SUPPORT THE RECONSTRUCTION AND MODERNIZATION OF CARGO HANDLING AND STORAGE INFRASTRUCTURE AT THE RECIPIENTS CROWN BAY FACILITY. WORK INCLUDES BULKHEAD REHABILITATION CONCRETE APRON RESTORATION RECONSTRUCTION OF SEVERAL CARGO STORAGE AREAS SECURITY IMPROVEMENTS INCLUDING LIGHTING FENCING AND FIRE PROTECTION AND STORM WATER MANAGEMENT PROJECTS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL CONSIST OF NINE ELEMENTS ELEMENT 1 1 DEVELOPMENT OF PLANS SPECIFICATIONS AND ESTIMATE WORK UNDER THIS ELEMENT WILL CREATE THE NECESSARY ENGINEERING DOCUMENTATION FOR ALL THE BELOW ELEMENTS IN ORDER TO PROCURE THE CONSTRUCTION CONTRACTOR AND IMPLEMENT THE PROJECT. ELEMENT 1 BULKHEAD REHABILITATION WORK UNDER THIS ELEMENT WILL REPAIR ROUGHLY 400 LINEAR FEET LF OF BULKHEAD CAP BEAM 14 200 TON MOORING BOLLARDS AND 48 FOAM FILLED FENDERS. ELEMENT 1 3 CONCRETE APRON RESTORATION WORK UNDER THIS ELEMENT INCLUDES ROUGHLY 31000 SQUARE FEET SF CONCRETE APRON RECONSTRUCTION 850 LF OF STORMWATER TRENCH DRAIN AND THREE OIL WATER SEPARATORS. ELEMENT 1 4 SECURITY IMPROVEMENTS WORK UNDER THIS ELEMENT INCLUDES INSTALLATION OF ROUGHLY 1300 LF OF CHAIN LINK SECURITY FENCING AND CONVERTING NINE EXISTING HIGH MAST LIGHT POLES TO LED FIXTURES. ELEMENT 1 5 FIRE PROTECTION WORK UNDER THIS ELEMENT INCLUDES INSTALLATION OF ROUGHLY 1400 LF OF 10 INCH WATER MAIN 1100 LF OF 8 INCH WATER MAIN AND NINE FIRE HYDRANTS. ELEMENT 1 6 STORMWATER MANAGEMENT WORK UNDER THIS ELEMENT INCLUDES ADDITIONAL STORMWATER CATCH BASINS AND YARD PIPING. ELEMENT 17 CONTAINER STORAGE AREA RECONSTRUCTION WORK UNDER THIS ELEMENT INCLUDES PAVEMENT RECONSTRUCTION OF THREE STORAGE AREAS TOTALING ROUGHLY 183532 SF. ELEMENT 1 8 SECURITY IMPROVEMENTS WORK UNDER THIS ELEMENT INCLUDES INSTALLATION OF FOUR HIGH MAST LIGHT POLES WITH LED FIXTURES. ELEMENT 1 9 STORAGE YARD IMPROVEMENTS WORK UNDER THIS ELEMENT INCLUDES ADDITIONAL PAVING WORK OF STORAGE YARD AREAS TO INCREASE OPERATING SPACE STORAGE SPACE AND TRAILER PARKING SPACE. ALSO INCLUDES ADDITIONAL UTILITIES SECURITY FENCING LIGHTING AND STORMWATER MANAGEMENT FOR SAFE AND EFFICIENT OPERATIONS FOR THE EASTERN PORTION OF THE TERMINAL YARD. DELIVERABLES EXPECTED OUTCOMES THE OUTCOME PERFORMANCE MEASUREMENT IS OUTLINE IN TABLE IN ATTACHMENT C PAGE 8 OF THE GRANT AGREEMENT. INTENDED BENEFICIARY VIRGIN ISLAND PORT AUTHORITY. SUBRECIPIENT ACTIVITIES NONE. 21869260.0 929013.89   2024-01-29 2030-07-31 2026-07-27 19:42:26 usaspending VIRGIN ISLAND PORT AUTHORITY
Powered by Datasette · Queries took 4.008ms